Fire Compliance
The strength of our offering is not only our technical experience and competency in relation to design solutions, specification and management of works on site but also due to the fact that we have real continuity in delivery as all disciplines work together under one roof.
Our Fire Compliance team is made up of the various disciplines within the practice
Capital have a long association with Public Sector & Housing Association Clients and therefore our knowledge and understanding of high, medium and low rise blocks and their construction deficiencies in respect of fire is highly significant. We have undertaken several pre and post Grenfell cladding replacement schemes and as a result we have a very good understanding and knowledge of cladding investigations works, material and option appraisal reports, design solutions and delivery of projects on site.
Cladding Assessment & Redemption Process Map
01
Identification
MHCLG Data Collection
EWS1 Form
Fire Risk Assessment
H&S File Information
02
Investigations
Intrusive Investigations
Material Testing
Establish Existing Construction
Option Appraisal Report
03
Procurement Approach
2 Stage Design & Build
Traditional Tendering
Negotiation
Frameworks
04
Design Solution
Appointment of Competent
Design Team
Design Development & Sign Off
Statutory Approvals
Agreement of Project Cost
05
Construction
Construct Design Solution
Implement Agree QA Procedures
Statutory & Independent Sign Off
Completion of EWS1 Form
Our hands on experience and proven track record of delivery gives us a real advantage over our competitors and our projects are all led by our Managing Directors to ensure that our Clients are getting our most experienced and competent staff leading the delivery of their projects
Our Fire Compliance Services:
- Survey, Identification & Intrusive Investigations of Cladding Materials & Systems
- Option Appraisal Reports for Cladding Replacement
- Cladding Replacement Design & Specification
- Management of Cladding Replacement Works & Quality Control Systems on Site
- PIB Layout Drawings
- Retrofit Sprinkler Feasibility Reports
- Design & Management of Retrofit Sprinkler Installations
- Fire Compliance Reports & Recommendations based on Clients FRA’s
- Fire Compartmentation Design & Management
- Fire Door & Screen Replacements Specification & Management
- Design & Management of Emergency Lighting, Fire Alarms & Smoke Alarm Systems
- Lift Replacement Design, Specification & Management
Find out more
It was Capital’s meticulous attention to detail and first-class contract management that made the Dairy Close project a notable success, not only in terms of fire safety, but also in achieving superb quality and value for money on the project. We know we are in safe hands with Capital with projects of this nature
Gary Lea – Project Manager, London & Quadrant Housing Trust
Projects
180 Stratford High Street, ACM & EWI Cladding Replacement
Capital were commissioned by Savills, on behalf of Aberdeen Standard to manage the delivery of an ACM
& EWI cladding replacement scheme to 3.No blocks of resident flats at 180 Stratford High Street.
East Kent Housing – Fire Compliance Reports to 6. No High Rise Blocks
Capital were appointed by East Kent Housing to assess the suitability and condition of their existing Active Fire Detection and Fire Protective Systems to 6.No high-rise blocks in Ramsgate and Margate.
Walbrook House, Enfield – Stripping of Existing HPL Cladding
Capital were appointed by Enfield Council to manage the Phase 1, stripping of the existing HPL cladding panels to Walbrook House and for providing an Option Appraisal Report in respect of the proposed design solution for reinstatement.
Adair and Hazlewood House, Cladding Replacement and External Improvements
Capital were appointed by The Royal Borough of Kensington & Chelsea (RBKC) to provide design services from RIBA Stage 2 for the re-cladding and associated works at Adair and Hazelwood Towers.
St Marys Church House & Slade Tower, Retrofit Sprinkler Project
Capital were commissioned by L&Q to design and manage their first retrofit sprinkler installation project to a sheltered housing block / resident care home (31 units) in Walthamstow and a high-rise tower block (42 units) in Leighton, East London.
Chalcots Estate – Fire Compliance Works
Capital were commissioned by the London Borough of Camden to manage the compliance process and documentation for the fire upgrade works to 5.No high blocks of flats in Swiss Cottage, North London.
Dairy Close – ACM Cladding Replacement
Capital were commissioned by London & Quadrant to manage the delivery of an ACM cladding replacement scheme to 5.No blocks of flats in Parsons Green, South West London.
Clyde & Dartmouth – ACM & Shiplap Cladding Replacement Works
Capital were commissioned by London & Quadrant to manage the delivery of an ACM & Timber Shiplap cladding replacement scheme to 2.No blocks of flats in Forest Hill, South East London.
How can we help?
We pride ourselves on offering a personal service to each of our customers. Whatever your property requirements, please get in touch with us using the general enquiry form.