Capital were appointed by East Kent Housing to assess the suitability and condition of their existing Active Fire Detection and Fire Protective Systems to 6.No high-rise blocks in Ramsgate and Margate.
Capital were appointed by East Kent Housing to assess the suitability and condition of their existing Active Fire Detection and Fire Protective Systems to 6.No high-rise blocks in Ramsgate and Margate.
The reports included for the production of scoping documents and recommendations for improvements, changes or alterations to bring the blocks up to current fire guidance and legislation requirements and address any concerns found within their Fire Risk Assessment.
The reports reviewed the external cladding material fixed to the buildings and considered the possible benefits of installing fire suppression systems. The reports also advised EKH on how ‘best practice’ could be achieved in line with the guidance contained
within Approved Document B volume 2 (AD-B), BS9999 and BS9991, to enable them to fully meet their obligations under the Regulatory Reform (Fire Safety) Order 2005.
Services
-
01Fire Compliance Assessment
-
02Fire Compliance Recommendations
-
03Budgeting
-
04Design
The findings / recommendations of the surveys were as follows:
- Replacement of combustible EWI cladding
- Install throughout a category LD2 alarm and detection system in accordance with BS5839 pt6 to flats.
- Upgrade existing communal fire detection and alarm system, provide facility for future interconnectivity.
- Replace all non LSF wiring in communal spaces.
- Replace all flat entrance door sets with certified FD30S in accordance with BS8214.
- Doors between the lobby, stair and corridor to be replaced by certified FD60S door sets.
- Survey and upgrade as appropriate all horizontal and vertical fire stopping to service ducts and penetrations between compartments to flats and communal areas.
- Install adequate emergency exit signage to BS5499-1 where appropriate throughout the building.
- Replace all surface linings within the common areas to ensure they achieve national class 0 rating.
- Retrofit new sprinkler systems.
- Install new independent flat ventilation systems to replace vertical shunt duct arrangements.