Kennington Park Square – ACM, Timber & EWI Cladding Replacement Scheme

  • Client: Urang / RMT Company Ltd
  • Services: Design Development & Coordination; Employers Agent & Project Management; Contract Administration & Clerk of Works; Structural & Façade Engineering; Quantity Surveying; Principal Designer; Planning Permission
Capital were commissioned by Urang Property Management Ltd on behalf of Kennington Park Square RMT Company Ltd to manage the delivery of an Aluminium, Timber & EWI cladding replacement scheme to 5.No blocks of residential flats in Kennington, London.
Contract Value:
£4.4m
Dates:
Sept 2020 to December 2023
Construction Phase:
October 2022 to December 2023
Contracts:
JCT Design & Build Contract
Capital acted as Employers Agents, Project Managers, Structural Engineers, Façade Engineers, Architects, Contract Administrators, Principal Designers & Clerks of Works for the project.

We were responsible for producing the initial compliance and option appraisal report for submission to the Building Safety Fund (to determine eligibility), appointing a specialist D&B contractor, formulating and agreeing the design solution with the contractor, reviewing and approving the design, agreeing the contract sum, undertaking the value for money report, appointing third party consultants for independent design sign off (i.e. Fire Engineers and Approved Inspectors) and managing the BSF application.

We are also responsible for developing and formulating the employer’s requirements and contract documents, coordinating the design team, contract administration and agreeing quality control, sign off and handover procedures on site through our clerk of works.

Services

  • 01
    Design Development & Coordination
  • 02
    Project Management
  • 03
    Employers Agent
  • 04
    Planning Permission
  • 05
    Contract Administration
  • 06
    Structural & Façade Engineering
  • 07
    Quantity Surveying
  • 08
    Principal Designer
  • 09
    Clerk of Works

The design solution was developed through a process of investigations, significant consideration in terms of the design solutions, third party input in respect of design approval and sign off and close cost control.

The project was procured via a design and build contract with the contractor appointed via a cladding contractor’s framework and engaged via a pre-construction services agreement to work closely with the design team to develop and agree the design solution and contract sum to take forward to the Building Safety Fund application.

Planning Permission was achieved via a full plans planning application and Building Regulation Approval via an Approved Inspector.

The project started on site in October 2022 with works due to be completed in December 2023.

Key Contacts

Patrick Madigan
BSc (Hons) MRICS

Managing Director

patrick@capitalpcc.co.uk
Steve Davis
BScEng (hons) CEng MIStructE MSFE

Director of Structural Engineering

steve.davis@capitalpcc.co.uk

The project required a knowledge and understanding of several cladding systems in order to formulate appropriate design solutions. As the scheme was subject to a Building Safety Fund application it was critical that the eligibility assessment was presented correctly, and the key milestones and timelines achieved to obtain funding.

Jerome Bloom Technical Manager for Capital